Scenarios
Energy & Utilities · Energy · ESSExample scenario
ESS Charge/Discharge
Simply charging when power is cheap and discharging when it is expensive wears batteries out fast and loses money in the long run.
−9%Electricity cost
−15%Battery capacity fade rate
Example scenario. Figures are illustrative.
Digital twin image in preparation
On the floor
- Situation
- Power is very cheap tonight, but battery temperature is high and cycle count is large, so charging risks degradation.
- Trade-off
- More cycling widens tariff savings but can bring battery replacement forward by about a year.
- Limit
- There is no rule that weighs battery health (SoH) against complex tariffs when setting charge and discharge.
01
02
03
How we solve it
Learns how operation affects revenue and battery wear from cycling history, cell temperature and tariffs, then calculates hourly charge and discharge within SoC and temperature limits.
Plant data
- State of charge (SoC)
- Cell temperature
- Cumulative cycles
- Hourly electricity tariff
- Load forecast
Prescription
- Night charging rate0.5C → 0.35C
- Peak-hour discharge1.8 MWh → 2.1 MWh
Also adjustedCell balancing timingCooling system intensity
Constraints
- SoC within 10–90%
- Cell temperature ≤ 45 ℃
Expected results
Electricity cost−9%
KRW 120M/mo→KRW 109M/mo
BeforeExpected
Battery capacity fade rate−15%
2.0%/yr→1.7%/yr
BeforeExpected
Could this work for your process?
Tell us about your process and data, and we will assess feasibility.
Scenarios

Energy & Utilities
Coagulation/Settling
Example scenarioCoagulation/Settling
Coagulant Dosing in Water Treatment
Prescribes coagulant dosing to match raw water quality and cut chemical costs.
−12%
Coagulant usage
−8%
Sludge generation
PAC dose 28 mg/L → 24 mg/L
Energy & Utilities
Plant Power
Example scenarioPlant Power
High-Load Equipment Output
Prescribes compressor and chiller output by tariff period to cut peak charges.
−11%
Electricity cost
−14%
Peak demand
Compressor #2 output at peak 100% → 70%
Energy & Utilities
Virtual Power Plant (VPP)
Example scenarioVirtual Power Plant (VPP)
VPP Distributed Resource Operation
Prescribes ESS discharge and demand response curtailment from generation forecasts.
−30%
Output deviation penalties
−12%
Power procurement cost
14:00 ESS discharge 0.8 MWh → 1.5 MWh