Scenarios
Energy & Utilities · Energy · Virtual Power Plant (VPP)Example scenario
VPP Distributed Resource Operation
Solar and wind output swings with the weather, so committed output is missed or costly reserve power must be bought.
−30%Output deviation penalties
−12%Power procurement cost
Example scenario. Figures are illustrative.
Digital twin image in preparation
On the floor
- Situation
- Clouds roll in and solar output falls 30% within 30 minutes, leaving no margin on committed output.
- Trade-off
- Buying reserve power right away costs money; not buying risks shortfall penalties and grid instability.
- Limit
- Operations follow the day-ahead plan, and recalculating for same-day weather takes time.
01
02
03
How we solve it
Learns how operation affects revenue and shortfall from weather, per-resource output, SMP and ESS state, then calculates ESS discharge and DR curtailment within equipment limits.
Plant data
- Irradiance & wind speed
- Hourly SMP
- ESS state of charge (SoC)
- Output per resource
Prescription
- 14:00 ESS discharge0.8 MWh → 1.5 MWh
- 15:00 demand response (DR) curtailment0 MW → 2.0 MW
Also adjustedSolar output curtailment
Constraints
- Depth of discharge (DoD) ≤ 80%
- Within transformer capacity
Expected results
Output deviation penalties−30%
KRW 60M/mo→KRW 42M/mo
BeforeExpected
Power procurement cost−12%
KRW 500M/mo→KRW 440M/mo
BeforeExpected
Could this work for your process?
Tell us about your process and data, and we will assess feasibility.
Scenarios

Energy & Utilities
Coagulation/Settling
Example scenarioCoagulation/Settling
Coagulant Dosing in Water Treatment
Prescribes coagulant dosing to match raw water quality and cut chemical costs.
−12%
Coagulant usage
−8%
Sludge generation
PAC dose 28 mg/L → 24 mg/L
Energy & Utilities
ESS
Example scenarioESS
ESS Charge/Discharge
Prescribes hourly charge and discharge from tariffs and battery condition.
−9%
Electricity cost
−15%
Battery capacity fade rate
Night charging rate 0.5C → 0.35C
Energy & Utilities
Plant Power
Example scenarioPlant Power
High-Load Equipment Output
Prescribes compressor and chiller output by tariff period to cut peak charges.
−11%
Electricity cost
−14%
Peak demand
Compressor #2 output at peak 100% → 70%