Energy & Utilities · Energy · Virtual Power Plant (VPP)Example scenario

VPP Distributed Resource Operation

Solar and wind output swings with the weather, so committed output is missed or costly reserve power must be bought.

−30%Output deviation penalties
−12%Power procurement cost

Example scenario. Figures are illustrative.

Digital twin image in preparation

On the floor

01
Situation
Clouds roll in and solar output falls 30% within 30 minutes, leaving no margin on committed output.
02
Trade-off
Buying reserve power right away costs money; not buying risks shortfall penalties and grid instability.
03
Limit
Operations follow the day-ahead plan, and recalculating for same-day weather takes time.

How we solve it

Learns how operation affects revenue and shortfall from weather, per-resource output, SMP and ESS state, then calculates ESS discharge and DR curtailment within equipment limits.

Plant data

  • Irradiance & wind speed
  • Hourly SMP
  • ESS state of charge (SoC)
  • Output per resource

Prescription

  • 14:00 ESS discharge0.8 MWh → 1.5 MWh
  • 15:00 demand response (DR) curtailment0 MW → 2.0 MW
Also adjustedSolar output curtailment

Constraints

  • Depth of discharge (DoD) ≤ 80%
  • Within transformer capacity

Expected results

Output deviation penalties−30%
KRW 60M/mo→KRW 42M/mo
BeforeExpected
Power procurement cost−12%
KRW 500M/mo→KRW 440M/mo
BeforeExpected