Scenarios
Energy & Utilities · Water Treatment · Coagulation/SettlingExample scenario
Coagulant Dosing in Water Treatment
Raw water quality swings with rain and season, but coagulant dosing changes only at each jar test. In between, operators overdose for safety, raising chemical cost and sludge.
−12%Coagulant usage
−8%Sludge generation
Example scenario. Figures are illustrative.


Plant dataRaw water turbidity120 NTU
PrescriptionPAC dosing rate28 → 24 mg/L
PrescriptionRapid mix intensityHold
Expected resultSettled turbidityHeld ≤ 1.0 NTU
Plant dataPrescriptionExpected result
On the floor
- Situation
- A pre-dawn downpour raised raw water turbidity from 15 NTU to 120 NTU in three hours.
- Trade-off
- Dosing much more raises chemical cost and sludge; dosing too little lets settled water turbidity exceed the limit.
- Limit
- Jar tests run once or twice a day, so operators cover changes in between by generous overdosing.
01
02
03
How we solve it
Learns how dosing affects treated water quality from raw water turbidity, pH, temperature, dose and settled water turbidity, then calculates only the dose needed within water quality limits.
Plant data
- Raw water turbidity
- Raw water pH & temperature
- Alkalinity
- Plant flow
- Settled water turbidity
Prescription
- PAC dose28 mg/L → 24 mg/L
- Rapid mixing intensityHold
Also adjustedpH adjuster dose
Constraints
- Settled water turbidity ≤ 1.0 NTU
- Treated water pH 5.8–8.5
Expected results
Coagulant usage−12%
25 mg/L→22 mg/L
BeforeExpected
Sludge generation−8%
12.5 t/day→11.5 t/day
BeforeExpected
Could this work for your process?
Tell us about your process and data, and we will assess feasibility.
Scenarios
Energy & Utilities
ESS
Example scenarioESS
ESS Charge/Discharge
Prescribes hourly charge and discharge from tariffs and battery condition.
−9%
Electricity cost
−15%
Battery capacity fade rate
Night charging rate 0.5C → 0.35C
Energy & Utilities
Plant Power
Example scenarioPlant Power
High-Load Equipment Output
Prescribes compressor and chiller output by tariff period to cut peak charges.
−11%
Electricity cost
−14%
Peak demand
Compressor #2 output at peak 100% → 70%
Energy & Utilities
Virtual Power Plant (VPP)
Example scenarioVirtual Power Plant (VPP)
VPP Distributed Resource Operation
Prescribes ESS discharge and demand response curtailment from generation forecasts.
−30%
Output deviation penalties
−12%
Power procurement cost
14:00 ESS discharge 0.8 MWh → 1.5 MWh