Scenarios

Scenarios by process

Examples of what we prescribe in each process. Figures are illustrative.

Manufacturing
Other industries

31 scenarios

Steel & Specialty Steel
Leaching/Neutralization
Example scenario

pH Control in Leaching & Neutralization

Prescribes caustic soda dosing to hold pH on target and raise nickel recovery.

+4.8%
Nickel recovery
−62%
Time out of pH range
−9%
Caustic soda usage
Caustic soda dosing 12.0 L/h → 13.4 L/h
Steel & Specialty Steel
Electric Arc Furnace
Example scenario

EAF Flux Addition

Prescribes lime addition to hit tapping temperature and cut power use.

+12%p
Tapping temp. hit rate
−3.1%
Power intensity
−8%
Lime consumption
Voltage tap 6 → 5
Steel & Specialty Steel
Open-Die Press
Example scenario

Forging Pass Reduction Schedule

Prescribes reduction per pass and rotation angle to cut reheating cycles.

−1
Reheats
−9%
Forging cycle time
Reduction per pass 45 mm → 38 mm
Steel & Specialty Steel
Bar Mill
Example scenario

Bar Rolling Roll Gap

Prescribes roll gap and cooling water flow to reduce bar diameter variation.

−40%
Diameter deviation
−12%
Rework length
Roll gap 14.2 mm → 14.0 mm
Steel & Specialty Steel
Quenching
Example scenario

Quench Cooling for Forged Shafts

Prescribes cooling water flow and immersion speed to reduce hardness spread and distortion.

−22%
Hardness spread
−15%
Distortion defects
Immersion speed 0.8 m/s → 0.6 m/s
Steel & Specialty Steel
Ladle
Example scenario

Ladle Ferroalloy Addition

Prescribes nickel and chromium ferroalloy additions to raise chemistry hit rate.

+9%p
First-time chemistry hit rate
−3.2%
Ferroalloy usage
−40%
Re-additions
Ferronickel addition 1,250 kg → 1,180 kg
Steel & Specialty Steel
Anomaly response
Example scenario

Operating Conditions on Anomaly Signs

Prescribes speed and load for a machine showing anomalies, lowering failure risk while production continues until maintenance.

−38%
Unplanned downtime
+6%
Overall equipment effectiveness (OEE)
Spindle speed until maintenance 1,800 rpm → 1,500 rpm
Steel & Specialty Steel
Outgoing Inspection
Example scenario

Inspection Intensity by Lot

Prescribes inspection intensity so high-risk lots get the most checks.

−30%
Inspection cost
−35%
Defect escapes
Lot 2417 sampling rate 5% → 20%
Chemicals
Continuous Reactor
Example scenario

Reactor Feed Ratio

Prescribes feed ratio and reaction temperature to raise yield and cut by-products.

+2.6%
Target product yield
−14%
By-product formation
Feed B/A molar ratio 1.20 → 1.15
Chemicals
Distillation Column
Example scenario

Distillation Reflux & Steam

Prescribes reflux ratio and reboiler steam to hold purity with less steam.

−6%
Steam usage
−20%
Time off purity spec
Reflux ratio 3.2 → 2.9
Chemicals
Naphtha Cracker
Example scenario

Cracker Coil Outlet Temperature (COT)

Prescribes COT and steam-to-feed ratio to raise ethylene yield and run length.

+1.2%p
Ethylene yield
+8%
Decoking interval
Coil outlet temperature (COT) 835 ℃ → 842 ℃
Semiconductors
Etch
Example scenario

Etch Gas & RF Settings

Prescribes gas flow and RF power to improve etch uniformity and yield.

+4.2%
Yield
−18%
CD variation
CF₄ flow 80 sccm → 74 sccm
Semiconductors
CVD Deposition
Example scenario

CVD Film Thickness Uniformity

Prescribes deposition temperature and gas flow to improve film uniformity.

−25%
Within-wafer thickness non-uniformity
−15%
Reworked wafers
Edge heater temperature 550 ℃ → 556 ℃
Energy & Utilities
Coagulation/Settling
Example scenario

Coagulant Dosing in Water Treatment

Prescribes coagulant dosing to match raw water quality and cut chemical costs.

−12%
Coagulant usage
−8%
Sludge generation
PAC dose 28 mg/L → 24 mg/L
Energy & Utilities
ESS
Example scenario

ESS Charge/Discharge

Prescribes hourly charge and discharge from tariffs and battery condition.

−9%
Electricity cost
−15%
Battery capacity fade rate
Night charging rate 0.5C → 0.35C
Energy & Utilities
Plant Power
Example scenario

High-Load Equipment Output

Prescribes compressor and chiller output by tariff period to cut peak charges.

−11%
Electricity cost
−14%
Peak demand
Compressor #2 output at peak 100% → 70%
Energy & Utilities
Virtual Power Plant (VPP)
Example scenario

VPP Distributed Resource Operation

Prescribes ESS discharge and demand response curtailment from generation forecasts.

−30%
Output deviation penalties
−12%
Power procurement cost
14:00 ESS discharge 0.8 MWh → 1.5 MWh
Energy & Utilities
Microgrid
Example scenario

Building Load Balancing

Prescribes cooling and charger output from solar generation and equipment load.

−20%
Grid power purchased
−12%
Peak demand
Output per charger 11 kW → 7 kW
Energy & Utilities
EV Charging
Example scenario

Charger Output Allocation

Prescribes output per charger from each vehicle’s request and building power headroom.

+30%
Charger utilization
−25%
Average charging wait
Output for vehicles leaving soon 50 kW → 100 kW
Supply chain
Replenishment
Example scenario

Multi-Site Inventory Replenishment

Prescribes SKU order quantities and inter-site transfers to cut stock and stockouts.

−20%
Average inventory
+3%p
Fill rate
SKU-3021 order quantity 1,200 units → 950 units
Supply chain
Global Sourcing
Example scenario

Purchase Split by Supplier

Prescribes purchase share per supplier and air freight share from FX, tariffs and freight.

−12%
Total procurement cost
−40%
Supply disruption risk index
Supplier A share 60% → 45%
Supply chain
Production Planning
Example scenario

Sales-Driven Production Volume

Prescribes daily output and line run hours from sales velocity by channel.

−35%
Lost sales
−8%
Finished goods days of stock
New product daily output 2,000 units → 2,600 units
Supply chain
Cross-Border Inventory
Example scenario

Cross-Border Stock Transfer

Prescribes inter-region transfers and production order allocation to cut unmet orders.

+15%
Inventory turnover
−28%
Unmet orders
North America → Europe transfer 0 units → 4,500 units
Logistics
Last-Mile Delivery
Example scenario

Last-Mile Delivery Load

Prescribes delivery load and promised arrival buffers from site conditions and driver history.

−45%
ETA error
−15%
Cost per delivery
Zone 3 load per driver 120 stops → 105 stops
Logistics
Picking Robots
Example scenario

Picking Robot Speed and Charging Thresholds

Prescribes speed caps and charging start thresholds from robot battery and workload.

+18%
Throughput per hour (TPH)
−40%
Robot collisions & stops
Aisle speed cap 1.5 m/s → 1.2 m/s
Logistics
Cold Chain
Example scenario

Reefer Truck Cooling Setpoint

Prescribes reefer setpoint and output from outside temperature and door-opening patterns.

−60%
Time out of temperature range
−50%
Temperature-related write-offs
Reefer setpoint −18 ℃ → −21 ℃
Retail
Pricing
Example scenario

Item-Level Markdown

Prescribes item discounts from stock, shelf life and competitor prices.

+6%
Operating profit
−25%
Fresh food waste
Salad A discount (from 18:00) 0% → 20%
Retail
Customer Promotions
Example scenario

Coupon Discount per Customer

Prescribes coupon discount and send delay from purchase history and app usage.

+22%
Conversion rate
+25%
Return on ad spend (ROAS)
Coupon discount 15% → 7%
Retail
Seasonal Merchandise
Example scenario

Seasonal Markdown Steps

Prescribes markdown steps per category from sell-through and new-season arrivals.

−30%
End-of-season leftover stock
+12%
Season total margin
Spring outerwear discount 0% → 20%
Retail
Shelf Display
Example scenario

Shelf Space per Item

Prescribes shelf space per item from item margins and shopper paths.

+18%
Sales per square meter
−30%
Display change labor time
Trend item A facings 2 → 5
Healthcare
Chemotherapy
Example scenario

Chemotherapy Dose Adjustment

Prescribes a dose adjustment for clinician review from blood test trends and clinical guidelines.

−30%
Adverse event rate
−15%
Average length of stay
Cycle 2 dose 100% → 80%

What would OPTI-X
prescribe for your process?

Before you commit, check feasibility on virtual data in OPTIVERSE.