Scenarios
Energy & Utilities · Energy · EV ChargingExample scenario

Charger Output Allocation

A building's transformer capacity is fixed, so simultaneous charging trips breakers or slows charging.

+30%Charger utilization
−25%Average charging wait

Example scenario. Figures are illustrative.

Digital twin image in preparation

On the floor

01
Situation
On a weekend afternoon, 50 EVs at a mall request fast charging at once, but headroom covers only 20.
02
Trade-off
Sharing power evenly slows everyone; charging in turn makes later vehicles wait longer.
03
Limit
First-come charging ignores departure times, battery levels and building power use.

How we solve it

Learns how output allocation affects charging completion from per-vehicle requests, departure times and building power data, then calculates output per charger within supply capacity.

Plant data

  • Requested charge per vehicle
  • Planned departure time
  • Battery level
  • Charger temperature
  • Building power use

Prescription

  • Output for vehicles leaving soon50 kW → 100 kW
  • Output for long-stay vehicles50 kW → 22 kW
Also adjustedDeparture notice for charged vehicles

Constraints

  • Within building service capacity
  • Charger output limit to prevent overheating

Expected results

Charger utilization+30%
40%→52%
BeforeExpected
Average charging wait−25%
20 min→15 min
BeforeExpected