Energy & Utilities · Energy · EV ChargingExample scenario
Charger Output Allocation
A building's transformer capacity is fixed, so simultaneous charging trips breakers or slows charging.
+30%Charger utilization
−25%Average charging wait
Example scenario. Figures are illustrative.
Digital twin image in preparation
On the floor
- Situation
- On a weekend afternoon, 50 EVs at a mall request fast charging at once, but headroom covers only 20.
- Trade-off
- Sharing power evenly slows everyone; charging in turn makes later vehicles wait longer.
- Limit
- First-come charging ignores departure times, battery levels and building power use.
01
02
03
How we solve it
Learns how output allocation affects charging completion from per-vehicle requests, departure times and building power data, then calculates output per charger within supply capacity.
Plant data
- Requested charge per vehicle
- Planned departure time
- Battery level
- Charger temperature
- Building power use
Prescription
- Output for vehicles leaving soon50 kW → 100 kW
- Output for long-stay vehicles50 kW → 22 kW
Also adjustedDeparture notice for charged vehicles
Constraints
- Within building service capacity
- Charger output limit to prevent overheating
Expected results
Charger utilization+30%
40%→52%
BeforeExpected
Average charging wait−25%
20 min→15 min
BeforeExpected
Could this work for your process?
Tell us about your process and data, and we will assess feasibility.
Scenarios

Energy & Utilities
Coagulation/Settling
Example scenarioCoagulation/Settling
Coagulant Dosing in Water Treatment
Prescribes coagulant dosing to match raw water quality and cut chemical costs.
−12%
Coagulant usage
−8%
Sludge generation
PAC dose 28 mg/L → 24 mg/L
Energy & Utilities
ESS
Example scenarioESS
ESS Charge/Discharge
Prescribes hourly charge and discharge from tariffs and battery condition.
−9%
Electricity cost
−15%
Battery capacity fade rate
Night charging rate 0.5C → 0.35C
Energy & Utilities
Plant Power
Example scenarioPlant Power
High-Load Equipment Output
Prescribes compressor and chiller output by tariff period to cut peak charges.
−11%
Electricity cost
−14%
Peak demand
Compressor #2 output at peak 100% → 70%