Steel & Specialty Steel · Forging · Open-Die PressExample scenario

Forging Pass Reduction Schedule

Pass planning for large ingots relies on veteran experience. When the workpiece cools faster than expected, one more reheat is needed, adding cycle time and fuel.

−1Reheats
−9%Forging cycle time

Example scenario. Figures are illustrative.

Plant dataSurface temp.1,105°C
PrescriptionReduction per pass45 → 38 mm
PrescriptionManipulator rotation90 → 45°
PrescriptionFeed pitch120 → 100 mm
Expected resultReheats3 → 2
Plant dataPrescriptionExpected result

On the floor

01
Situation
Midway through forging a 40-ton ingot, surface temperature has fallen to 900 ℃ at pass 20.
02
Trade-off
Larger reductions could finish before reheating, but too much on a cooler workpiece causes surface cracks.
03
Limit
Passes are planned by feel, with no estimate of how far temperature will fall over the remaining passes.

How we solve it

Learns how reduction conditions affect cooling and cracking from per-pass temperature, load and dimension records, then calculates reduction and rotation for the remaining passes within the range validated by data.

Plant data

  • Workpiece surface temperature
  • Current cross-section
  • Press load
  • Cumulative passes

Prescription

  • Reduction per pass45 mm → 38 mm
  • Manipulator rotation90° → 45°
  • Feed pitch120 mm → 100 mm
Also adjustedReheat timing

Constraints

  • Finish forging temperature ≥ 850 ℃
  • Within maximum press load

Expected results

Reheats−1
3→2
BeforeExpected
Forging cycle time−9%
110 min→100 min
BeforeExpected