Scenarios
Energy & Utilities · Energy · MicrogridExample scenario
Building Load Balancing
On-site generation is curtailed when in surplus, and expensive grid power is drawn when short, so money leaks both ways.
−20%Grid power purchased
−12%Peak demand
Example scenario. Figures are illustrative.
Digital twin image in preparation
On the floor
- Situation
- At 6 p.m., 30 EV chargers in the building start at once and load approaches contracted demand.
- Trade-off
- Limiting charge speed inconveniences users; not limiting it risks excess charges and equipment faults.
- Limit
- Cooling, charging and lighting each run on fixed settings, ignoring solar output and indoor temperature together.
01
02
03
How we solve it
Learns how settings affect load and comfort from equipment power use, solar output and indoor temperature, then calculates output per system within indoor temperature and charging needs.
Plant data
- Power use per device
- Solar generation forecast
- Indoor temperature per zone
- Requested charge per charger
Prescription
- Output per charger11 kW → 7 kW
- Cooling setpoint24 ℃ → 25 ℃
- Common-area lightingHold
Also adjustedCommon-area lighting level
Constraints
- Indoor temperature 22–26 ℃
- Minimum charge secured for vehicles about to leave
Expected results
Grid power purchased−20%
1,500 MWh/mo→1,200 MWh/mo
BeforeExpected
Peak demand−12%
8.0 MW→7.0 MW
BeforeExpected
Could this work for your process?
Tell us about your process and data, and we will assess feasibility.
Scenarios

Energy & Utilities
Coagulation/Settling
Example scenarioCoagulation/Settling
Coagulant Dosing in Water Treatment
Prescribes coagulant dosing to match raw water quality and cut chemical costs.
−12%
Coagulant usage
−8%
Sludge generation
PAC dose 28 mg/L → 24 mg/L
Energy & Utilities
ESS
Example scenarioESS
ESS Charge/Discharge
Prescribes hourly charge and discharge from tariffs and battery condition.
−9%
Electricity cost
−15%
Battery capacity fade rate
Night charging rate 0.5C → 0.35C
Energy & Utilities
Plant Power
Example scenarioPlant Power
High-Load Equipment Output
Prescribes compressor and chiller output by tariff period to cut peak charges.
−11%
Electricity cost
−14%
Peak demand
Compressor #2 output at peak 100% → 70%